Home Products Schedule Of Events Staff Facilities E-Downloads President's Message Why PowerRail Contact

Enhancement Offering


27 Pin MU Tester

Simple Operation 110 Volt Required Class 1 Approvals
Operation instructions:
1. Plug in the Power Cord.
2. Turn the selector switch on the right side of the box to the on position.
3. Wait for the operator interface to power up and run a self-test.
4. When prompted by the display, press the Escape key. The display will show Ready to Start Test
5. Plug the Jumper Cable into the connectors on each side of the tester.
6. Press F1 to start the test. The display will show Test in Progress
7a. If the cable is good, when the test is completed the display will show Test Passed.
Removing the Cable from the tester will display Ready to Start Test again.
7b. If the cable fails the test, all faults such as open or crossed wires will be displayed.
Pressing the F2 key will reset one fault at a time, allowing identification of the reason the Cable failed,
until all of the faults are reset.
NOTE: Pressing F3 will abort a test in progress at any time and allow all faults to be reset by pressing F2 only once.
PowerRail P/N MAE-05 Tester PDF Download
   
27 Pin MU Jumper Cables MU Covers and Receptacles MU Head Parts Hose Hangers

Safety Release Jumper Cables 
Back to Enhancements Back to Products

Tel:570.883.7005

Home | Products | Schedule Of Events | Contact
Why Power Rail | Facilities | Staff | President's Message

 Fax:570.883.7006